Notice of Network Outage due to Construction and Maintenance during Summer Vacation on Hiyoshi Campus
Due to construction and maintenance during the summer break, the network will be down as follows.
We apologize for any inconvenience this may cause, and ask for your understanding and cooperation.
Wireless AP Replacement
We will be updating the wireless LAN equipment installed in each building on Hiyoshi Campus.
During the replacement work, there may be noise from the electric drivers and traffic restrictions due to the use of a stepladder.
Please note that wireless LAN (e.g. keiomobile2) will not be available near the installation site until the work is completed.
Work Schedule
Building | Storeys | Date and time of work | ||
Collaboration Complex | B2F | Sept. 6(Mon),7(Tue) | 09:00~17:00 | |
B1F | Sept. 6(Mon),7(Tue) | 09:00~17:00 | ||
1F | Sept. 6(Mon),7(Tue) | 09:00~17:00 | ||
2F | Sept. 6(Mon),7(Tue) | 09:00~17:00 | ||
2F(Fujiwara Hiroshi Hall) | Sept. 8(Wed) | 13:00~17:00 | ||
3F | Aug. 25(Wed) | 09:00~17:00 | ||
4F | Aug. 27(Fri) | 09:00~17:00 | ||
5F | Aug. 26(Thu) | 09:00~17:00 | ||
6F | Aug. 26(Thu) | 09:00~17:00 | ||
7F | Sept. 6(Mon),7(Tue) | 09:00~17:00 | ||
2nd Building | 1F-4F | Aug. 24(Tue) | 09:00~17:00 | |
3rd Building | 1F-3F | Aug. 24(Tue) | 13:00~17:00 | |
4th Building Section A | 1F-4F | Aug. 31(Tue) | 09:00~17:00 | |
4th Building Section B | 1F(J11、14) | Sept. 22(Wed) | 09:00~17:00 | |
1F(other than the above classrooms) | Sept. 1(Wed) | 09:00~17:00 | ||
2F(J21、24) | Sept. 22(Wed) | 09:00~17:00 | ||
2F(other than the above classrooms) | Sept. 1(Wed) | 09:00~17:00 | ||
3F | Aug. 31(Tue), Sept. 1(Wed) | 09:00~17:00 | ||
4th Building Independence Wing | B2F,B1F | Sept. 15(Wed),16(Thu) | 09:00~17:00 | |
1F,2F | Sept. 14(Tue),15(Wed) | 09:00~17:00 | ||
3F(D310、311、312) | Aug. 25(Wed) | 13:00~17:00 | ||
3F(other than the above classrooms) | Sept. 14(Tue),15(Wed) | 09:00~17:00 | ||
4F | Sept. 13(Mon),14(Tue) | 09:00~17:00 | ||
6th Building | B1F-4F | Aug. 30(Mon),31(Tue) | 09:00~17:00 | |
7th Building | B1F-3F | Sept. 2(Thu),3(Fri) | 09:00~17:00 | |
8th Building | 1F-4F | Aug. 24(Tue) | 09:00~13:00 | |
Raiosha | 1F-3F | Sept. 8(Wed) | 09:00~17:00 | |
Hiyoshi Library | B1F-4F | Aug. 23(Mon) | 09:00~17:00 | |
Jukusei Kaikan (Student Union Building) | B1F-4F | Aug. 30(Mon) | 09:00~17:00 | |
Fujiyama Memorial Hall | B1F-2F | Sept. 3(Fri) | 11:00~17:00 | |
Cafeteria Building | 1F-3F | Aug. 25(Wed) | 09:00~14:00 | |
Gymnasium | Sept. 3(Fri) | 09:00~10:00 | ||
Health Center (Hiyoshi Clinic) | 1F,2F | Sept. 2(Thu) | 09:00~12:00 | |
Sports Building | B1F-3F | Sept. 2(Thu) | 09:00~17:00 | |
Sports Medicine Research Center | Sept. 3(Fri) | 13:00~15:00 | ||
Athletic Field Annex Facility Building | Sept. 3(Fri) | 10:00~11:00 | ||
West Annex | Sept. 8(Wed) | 09:00~14:00 |
The above scheduled work time may vary slightly depending on the progress.
Hiyoshi Commemorative Hall and Raiosha (4th - 7th floors) are not included in the construction.
Renewal of network equipment in the Raiosha and the 4th Building Independence Wing
The network equipment installed on each floor of the Raiosha and the 4th Building Independence Wing will be undergoing renewal work.
Please note that there will be times when the wired and wireless LAN (keiomobile2, etc.) networks will be unavailable on each floor and throughout the building.
Work Schedule
Building | Storeys | Date and time of work | ||
Raiosha | 6F,7F | Sept. 4(Sat) | 09:30~11:00 | |
4F,5F | Sept. 4(Sat) | 12:30~14:00 | ||
3F | Sept. 4(Sat) | 14:30~16:00 | ||
2F | Sept. 5(Sun) | 09:30~11:30 | ||
1F | Sept. 5(Sun) | 13:30~15:30 | ||
All floors | Sept. 18(Sat) | 13:00~16:00 | ||
4th Building Independence Wing | 3F,4F | Sept. 18(Sat) | 09:30~11:30 | |
1F,2F | Sept. 18(Sat) | 12:45~14:45 | ||
B1F | Sept. 18(Sat) | 15:15~17:15 | ||
B2F、Approach BLDG | Sept. 19(Sun) | 09:30~11:45 | ||
All floors | Sept. 19(Sun) | 13:00~15:00 |
The above scheduled work time may vary slightly depending on the progress.
Maintenance for network equipment in the Hiyoshi Library, 4th Building A/B, and 6th Building
We will be performing maintenance on the network equipment installed in the Hiyoshi Library, 4th Bldg. A/B, and 6th Bldg.
Please note that both wired LAN and wireless LAN (e.g. keiomobile2) will be unavailable in each building until the work is completed.
Work Schedule
Building | Date and time of work | ||
6th Building | Aug. 23(Mon) | 09:00~12:00 | |
4th Building Section A/B | Aug. 23(Mon) | 13:00~16:00 | |
Hiyoshi Library | Aug. 26(Thu) | 09:00~12:00 |
The above scheduled work time may vary slightly depending on the progress.
Last-Modified: August 3, 2021
The content ends at this position.